MACHINE AND MACHINE FLEET AUDIT

Check whether your machines are safe and compliant with the regulations

We assess the technical condition, safeguards and documentation. You receive a non-conformity report, a risk assessment and a prioritised action plan.

Basis: Machinery Directive 2006/42/EC, Work Equipment Directive 2009/104/EC, CE declaration of conformity

One standard across the EU: Machinery Directive 2006/42/EC · Work Equipment Directive 2009/104/EC – the same requirements in every EU Member State.

WHAT YOU GET AFTER THE AUDIT

1

Why carry out an audit?

2

How does the process work?

3

What does the client gain?

QUESTION 1

Why carry out an audit?

Because the employer is responsible for machine safety. The audit shows whether that obligation is met before an inspection or an accident checks it.

Employer's responsibility

The employer provides safe machines and proper conditions for their use.

Legal requirements

Every machine must meet the requirements appropriate to its design and manner of use.

Inspection and risk

Non-conformities may mean corrective action, restricted operation and explanations during an inspection.

An old machine ≠ a new machine. Each has its own requirements.

MACHINE IN USE AT THE PLANT

Minimum requirements

Work Equipment Directive 2009/104/EC
≠
NEW OR SUBSTANTIALLY MODIFIED MACHINE

Conformity assessment and CE

Machinery Directive 2006/42/EC, declaration

An audit is particularly worthwhile:

after a machine modification

after a relocation

for a machine from outside the EU

before an inspection

before an upgrade

The same rules across the EU – an audit carried out at your site, wherever it is

27 Member States, one benchmark

The Machinery Directive 2006/42/EC and the Work Equipment Directive 2009/104/EC apply in all 27 EU Member States and are transposed into national law in each of them.

The same criteria in every country

The non-conformity report, risk assessment and prioritised action plan follow the same criteria, whichever EU country your plant is in.

On-site experience

REZONANS Sp. z o.o. from Zielona Góra delivers projects in Poland, Germany, the Netherlands and Sweden.

Does the audit apply in other EU countries?

Yes. The basis is EU Directives 2006/42/EC and 2009/104/EC, which apply in all Member States. We assess against the same criteria wherever your plant is located. Whether a specific report is recognised by an authority, insurer or client depends on their requirements, which we are happy to clarify with you in advance.

QUESTION 2

How does the process work?

In five steps: from defining the scope to a report with specific recommendations.

01

Audit organisation

We define the scope and the list of machines. We work with maintenance, OHS and operators.
02

Document analysis

We review the available technical and operating documentation.
03

Safety and conformity assessment

We check the condition of the machine, its safeguards, hazards, and the legal and standards requirements.

04

Inspection and documentation

For each machine we complete an inspection sheet and take photographic documentation.

05

Report and recommendations

Non-conformities, risk assessment, priorities and recommended corrective and upgrade actions.

What we need from you

INDICATIVE TIMEFRAME

How long will it take at your plant?

The time depends on the number and type of machines. Tell us the scope and we will prepare a schedule and a quote.

QUESTION 3

What does the client gain?

You know what is wrong, what to do, in what order and why.

Employee safety

Lower risk of accidents and downtime.

Compliance with law and standards

An organisation prepared for inspection.

Lower costs in the long term

Fewer failures and unplanned expenses.

Informed upgrades

Investments based on real needs and priorities.

Future readiness

We take new technologies, cybersecurity and ergonomics into account.

Documented machine condition

An inspection sheet and photos of every audited machine.

This is how our report reads

Illustrative layout, not the result of an actual audit

WHAT IS WRONG

RISK

PRIORITY

WHAT TO DO

No guard on the danger zone

High

1 – urgent

Install an interlocked guard

Emergency stop out of the operator’s reach

Medium

2 – plan

Additional E-STOP at the workstation

Outdated operating manual

Low

3 – complete

Update the documentation
WHAT SETS US APART

We do not stop at the report

The audit identifies needs. We can then implement the same recommendations with our own team – as part of our electrical installations and low-current installations.

How our cooperation works

01

Audit

02

Recommendations

03

Actions

04

Upgrade

Areas of implementation and technical support

Carrying out corrective actions

Preparing or updating documentation

Measurements and electrical work

Adapting safeguards

Machine upgrades

Support in conformity assessment and CE

Let's talk about the safety of your machines

Tell us how many machines you want to check. We will reply with a proposed scope and timeline.

Picture of Maciej Zalewski

Maciej Zalewski

Foreign projects
m.zalewski@rezonans.net.pl
+48 518 608 107

Request an audit

GDPR NOTICE: I consent to the processing of my personal data for the purpose of business contact and preparation of an audit proposal by REZONANS Sp. z o.o. The controller of your personal data is REZONANS Sp. z o.o., based in Zielona Góra at ul. Naftowa 2G. Providing data is voluntary but necessary to handle the enquiry.